Lanier Water Treatment Plant
Owner:
Gwinnett County, GA Department of
Water Resources
Location:
Buford, GA
Project Description:
The 150 MGD Lanier Water Treatment Plant is one of the most
important water production plants in the Southeast. Serving all of
Gwinnett County and portions of other metro Atlanta counties, this
modern facility is one of the largest plants in the country utilizing
ozone as the primary method of disinfection. As part of a plant
expansion in which plant capacity was expanded by fifty MGD,
Transdyn provided a fully integrated plant control and SCADA
system.
Managed by Transdyn’s DYNAC software suite, the system enables
operators to monitor and control the Lanier Water Treatment Plant,
the countywide water distribution system and storm water facilities.
Redundant servers and operator workstations located in the main
control room manage distributed control units and remote
workstations located throughout the facility via a redundant fiber
optic Ethernet network.